Work begins today to build a 3300 sq foot log home using Greatwoods
8 inch rustic peeled logs with Butt & Pass corners. This 3 bedroom3
bath home will feature a main floor master bedroom suite, wood ceilings,
a greatroom, loft and large family room. Large log tie beams and
log rafters will be installed in the greatroom. A screened porch
off the master suite will provide a cool spot on a warm summer evening. |
| Dry
conditions have allowed us a good week for digging the new foundation.
We attempt to keep as many trees as we possibly can. |
|
|
|
|
August 8
"With no rain this week, the foundation, is complete."
We're two weeks ahead of schedule." |
|
|
September 3 2003
The semi's arrived today right on time. The load is unloaded and
inventoried free of charge. Note that our material on the semi's
arrived covered with tarps! We only provide high quality clean
building material. I've seen other companies material arrive covered
with road grime, salt and soaking wet from rain. That's unacceptable
for
Wilderness Log Homes and
Burkhart & Company.
|
 |
|
|
| |
September
9 2003
We've been here five days and the first floor system is installed.
The walkout basement windows will look into the woods
|
|
|
September 26
We've been here under 30 days and the home is up! Windows and
logs arrive Oct 1st. We have the experience to do the job right,
on time and on budget!
|
|
|
|
| |
October 3 2003
We've had a good week, installing the Hurd windows and Independence
shangles. This shangle has a 50 year
warranty and is installed over 30lb felt paper! Other log home
companies cut corners by supplying 25 year shingles
and 15 lb felt. We supply the highest in quality building materials.
|
|
|
October
25
We are busy installing our handcrafted But N Pass 8 inch logs. |
|
|
|
|
 |
January 15,2004
The outside is stained and complete. The chimney is being stoned
now with the nice weather. Check back for interior pics as we finish
the interior by March 15, 2004. |
 |
|
 |
|
 |
[Home Page]  [ About
the Dealer]  [Planning Guides]  [
Log Systems]   [What's
Included]
[ Heating and Cooling Costs] [Local
Homes]  [ Photo Gallery]  [Open
Houses] [Contact Us] [Questions]
[Misc & Service] [Bed
& Breakfast] [Property] [Featured
Homes]
|